UMASS Lowell Details

Back to All Projects

UMASS Lowell

Lowell, MA

PROJECT INFORMATION

Phoenix Mechanical provided a complete HVAC System for the 22,000 sq. ft. laboratory space fit up of the 3rd and 4th floor of 110 Canal St.

HVAC SYSTEM

Installed HVAC systems include a 40 ton packaged VAV RTU, 8,000 CFM Lab Exhaust Plenum with heat recovery, fan powered VAV terminal units with hot water reheat, lab exhaust valve terminal units, and a compete BMS system for monitoring and control of laboratory mechanical systems.

Project Location Owner Engineer Contractor Value Completed
UMASS Lowell Lowell, MA Trinity Freudenberg ARUP USA Inc Aberthaw Construction $1,000,000 2015
For more information, please contact us.