Our Blog

Ardent Mills

Posted by in

PROJECT INFORMATION Gas and steam fit up for new steam generators and wheat heaters (dual system). HVAC SYSTEM Ardent is an existing eight story mill building. The addition is a new penthouse with two new steam generators. Phoenix was hired to design two gas risers to the new penthouse and equipment. Dual system stainless steel steam […]

Read More »

Bentley University

Posted by in

PROJECT INFORMATION Renovation of 4 story office building. The entire building was gutted and rebuilt. Project was completed on an accelerated 7 month construction schedule. HVAC SYSTEM The HVAC systems were coordinated in 3D. The first floor of the building is lab space served by an energy recovery unit located in the attic. The lab exhaust […]

Read More »

Fessenden School

Posted by in

PROJECT INFORMATION Provide energy efficient HVAC system for new Innovation Lab, meeting rooms and laser lab. HVAC SYSTEM Roof top energy recovery unit supplies air to a variable refrigerant heat pumps for main space temperature control. Additional variable refrigerant ceiling cassettes installed in the adjacent meeting room and laser laboratory. Destratification fans were installed to […]

Read More »

CARINA EXAMPLE

Posted by in

Content here

Read More »

EPA

Posted by in

Sepracor

Posted by in

Repligen

Posted by in

Microchips

Posted by in

Astra Zenaca

Posted by in

PROJECT INFORMATION  Two five-story wing additions and a new double-height penthouse at an R&D pharmaceutical / office facility. Majority of construction was concentrated on labs and an extremely dense and congested penthouse. HVAC SYSTEM  Duct systems included supply distribution system tied into custom AH units, extensive lab exhaust systems with Phoenix air valves and Tech […]

Read More »

EPA Mechanical Upgrades

Posted by in
For more information, please contact us.